Hampton St

A commercial property. Construction of 10 apartments and retail over 5 levels.

Completion Date: July 2019

Architects

Cornall

Builders

Bear Projects

Property Developers

Interest Property

Expanderpark System

This site was a challenge for the design team as the site had a car stacking machine pit that was constructed prior to Hercules being appointed as the supplier for this project.This meant that the pit did not conform to traditional dimensions and the overall internal ceiling height limited the vehicle accommodation.

Working with the builders and developer we designed a bespoke machine to suit the site and maximise vehicle dimensions.

The machine chosen for this site is an Expanderpark -2+2 system that is 3 vehicles wide. Hampton has accommodation for 10 vehicles.

The machine operates by remote control and is fully integrated into the front roller door and side safety gate.

Specifications

Parking: 10 Car spaces
Vehicle Length: – mm
Vehicle Width: –  mm
Vehicle Height: – mm